Innovative and State-Of-The-Art Solutions
As a sub-consultant, M&J Engineering's is performing Construction Inspection Services for this $134 million contract. This project is located on the segment of the Major Deegan Expressway (MDE) between E. 138th Street and the Macombs Avenue. Bridge work on this project includes the demolishing and disposing of existing 330,000 sq. ft. of concrete deck on the northbound /southbound roadway of the I-87 MDE and replacing it with new concrete. The work also involves the installation of a new concrete median barrier, between E. 138th St. and E. 161st St., near the Macombs Dam Bridge. A new energy-efficient LED lighting system will also be installed, enhancing visibility and safety on the elevated Major Deegan roadway and on Exterior St. below. The existing drainage systems will be upgraded on the MDE and on Exterior Street resulting in an improved drainage and run-off condition. Other work included in the project consists of the following: